Pick a starting point. Template durations and logic are typical placeholders — adjust them to your job.
Prints what's on screen. For a lookahead or one sub's tasks, set the Filter first — a lookahead fits the timeline to its weeks.
Otherwise the whole schedule is fitted to the sheet width and split across pages by rows. Collapsed summaries stay collapsed. Choose “Save as PDF” in your browser's print dialog for a PDF, and set margins to Default.
A PNG or JPEG, shown in the toolbar and at the top of every printed page. It is kept in this browser, not in the schedule file, so it appears on every schedule you open here and on none you send.
Critical path scheduling with a Gantt chart. Tasks link finish-to-start, start-to-start, finish-to-finish or start-to-finish, with lag, over a work calendar with holidays. It works out float and the critical path, keeps a baseline to measure slipping against, and tracks progress from a status date. Schedules open from and save to MS Project XML as well as their own file.
New offers a blank schedule or a template for a common job type. A template is only a starting point: check its durations and links against your own job.
Type tasks in the table. Durations are in workdays (5, 5d, 2w); 0 makes a milestone. Indent a task under another to make the one above it a summary.
5
5d
2w
0
Predecessors use row numbers: 4 (finish-to-start), 4SS, 4FF+2d, 4SF, 7FS-1d (lead). Use ed or ew for calendar-day lags that run through weekends and holidays, like cure time: 4FS+7ed. Separate several with commas. You can also drag a bar up or down onto another bar to link them.
4
4SS
4FF+2d
4SF
7FS-1d
ed
ew
4FS+7ed
Typing a date in Start or Finish sets a start/finish-no-earlier-than constraint, like MS Project. Dragging a bar sideways does the same. Clear it in Info.
Other constraints (Info): start/finish no later than, must start on, must finish on. The no-later-than types never move a task; they cap its late dates, so a task pushed past one shows negative float. Must-start/finish pin the task even if its predecessors say otherwise.
Calendar (Settings): pick the workdays and list holidays, one per line; the buttons load US federal or common construction holidays. Every duration, lag and float is counted in workdays on that calendar. One calendar covers the whole project.
Status date (in Settings) drives updates: tasks not started yet can't start before the day after it, and unfinished work on in-progress tasks is pushed past it and still waits for its predecessors. Actual dates are never moved to fit the links: progress recorded ahead of an unfinished predecessor is marked with a red “!”. Slipping shows as a later finish, and as finish variance in Info once a baseline is saved; float only goes negative when a no-later-than or must-finish date is being missed.
Baseline: Set baseline saves every task's current dates, and gray bars show them from then on. Re-setting overwrites the old one; Clear removes it. Duplicated tasks start without progress or baseline.
Float is total float in workdays; tasks with zero or negative float are critical and shown in red; Critical path in the Filter group turns the red off, on screen and in print, without changing any dates or float. Summary tasks span their subtasks, with % done weighted by duration, and are never critical themselves; their dates, duration and % can't be typed over.
Trace highlights the chain of tasks that sets the selected task's start. Info and the bar tooltip also say what drives each start.
Trade labels who does the work. Use Color by trade and the Filter menus for a sub's tasks or a 2–6 week lookahead; Print prints what's shown. Banded rows shades every other row to make a wide chart easier to read across.
Paste from Excel: copy cells and paste into any cell here — columns fill left to right from that cell in table order (Name, Trade, Duration, Start, Finish, Predecessors, Float is skipped, % done). Paste with rows selected (not in a cell) to insert the rows above.
Enter
Insert
Delete
Alt+Shift+→ ← ↑ ↓
Ctrl+F2
Ctrl+Shift+F2
Shift+F2
Ctrl+C
Ctrl+X
Ctrl+V
Ctrl+D
Alt+T
Ctrl+Z
Ctrl+Y
Ctrl+S
Ctrl+O
Ctrl+P
Files: Save writes a .json file that keeps everything. MSP XML exports to MS Project (File › Open there) and Open reads Project XML back in. Check the calendar after an import, since Project calendars carry more detail than this tool uses. CSV is a one-way export for spreadsheets.
Everything stays in this browser tab. Work is autosaved to this browser; use Save to keep a file.
Free to use, provided as is, with no warranty: see the terms of use.
This scheduler is made for a mouse and keyboard on a wide display. It won't work well on a phone.